6. ELECTRICAL INSTALLATION & CABLING
6.1 INTRODUCTION
Electrical installation of the equipment should only be carried out by a qualified
electrician following best safety practices at all times.
The cabling of the Stabiliser has to be sized according to the selected rating of the
Stabiliser.
The cable size selected should comply with local regulations for installation
requirements.
While normally all OSES Stabilisers are fitted as standard with an input circuit
breaker, in circumstances where such protection is not incorporated, the Installer
must install suitable circuit protection.
When the OSES Stabiliser is fitted with an input breaker, care must be taken to
ensure that the supply fuses/breaker is correctly sized to provide tripping
discrimination between the circuit protection devices in the event of a fault.
Before connecting the unit, it is essential that the mains voltage is verified and the
Stabiliser’s selected output load voltage is in accordance with local / required
requirements.
Check that the rating of the load shall not exceed the rating of the Stabiliser - as
shown on the unit’s rating plate. The load current should be measured using a true
RMS reading meter.
To ensure safety and the optimum performance of the Stabiliser, it is imperative
that the machine is properly earthed / grounded.
When cutting holes for cable entry and glanding care should be taken to ensure
that no swarfs enters the unit. Block off all unused holes.
In situations where the supply cannot be switched off to facilitate machine
maintenance, it is recommended that a maintenance manual bypass switch is
installed. This will ensure the availability of a direct mains supply for the load whilst
the Stabiliser is being serviced.